1-3 Hour Fire Rated Interior Steel Doors for Hotels Push and Pull Fire Exit with Lock Glass Finished Surface for Supermarkets

Customization: Available
Warranty: 2 Years
Screen Netting Material: Stainless Steel

Product Description

📋

Basic Info.

Surface Finishing
Finished
Function
Anti-Fire
Leadtime
15-25 Days
Max Size
3000*3000mm
Thermal Insulation
1.8-2.4W/(M2 K)
Color
Customized Color
Project Solution
Graphic Design
Design Style
Modern
Door Material
Timber
Acoustic Insulation
33-38dB
Application
High-Grade Office Commercial Building
🛡️

Products Description

Fire Rated Interior Steel Doors
Steel fire-rated door Specifications
CertificationsEN/BS/AS/UL10C/NFPA/ASTM
Filling MaterialMainly Perlite(350±35kg/m³)
Fire rated time120 mins
Door leaf sheet1.0 mm thickness galvanized steel sheet
Door frame sheet1.5mm thickness galvanized steel sheet
Surface finishPowder coated or painting as customised
Frame thickness50mm, 70mm
Frame depth100mm, 120mm
Opening directionSwing Inward / Outward
ApplicationOffice, hotel, church, home etc.
HardwareHinges, door closer, lockset, bolt and sequencer
Product View 1
Product View 2
STRICT QC CHECK STEPS
QC Steps
FIRE DOOR PACKAGE METHOD
Packaging
FIRE DOORS IN APPLICATION
📦

More Products

More Product Options
🏭

Production Line

Production Line View

Why Choose Us

Key Advantages
📜

Certifications

Certificates
🤝

Exhibition

Trade Show Exhibition
🚚

Product packaging

Final Packaging Details

Frequently Asked Questions

FAQ Header
Can different colors and models be mixed together in one order?
Surely yes. Mixed colors and models are acceptable in one 20GP or in one 40HQ; we suggest 3-6 models.
Can you make the door according to our drawing?
Yes, we can. But customers should send us drawings to check first, then we shall respond with the correct drawing for production.
What's your policy for samples?
For small samples, we can offer them for free. For complete doors, we have to charge some cost based on the actual situation. However, we will refund the sample charge if you place a bulk order next time.
What's your special service?
Overseas installation service.
How to order and what is the delivery time?
Delivery time is about 20-35 days. We first determine your specific door requests and specs, then issue related solutions. After approval of the invoice and drawings, a 50% deposit is arranged and production starts. After finishing, we provide videos/pictures or you can dispatch an inspector before collecting the balance.
Do you have stock available?
We stock standard hollow metal doors & frames. For specialized or customized orders, we arrange production based on specific size, color, lock type, and materials to meet project schedules.

Related Products